JECC "MIRO" Calcium Sulphate Raised Access Floor System Project Achievements
 Jun 21, 2013|View:279

 

JECC "MIRO" Calcium Sulphate Raised Access Floor System Project Achievements
         
ⅰ. Some Typital JECC "MIRO" Calcium Sulphate Raised Access Floor System Projects in China 
No. Project Name  Location Supply Area  
1 Shanghai IFC Shanghai  132000 m²  
2 Guangzhou Taikoo Hui Guangzhou  67154 m²  
3 Beijing JingAo center
 
Beijing 66000 m²  
4 CCTV  Beijing 61947 m²  
5 HZTV  Hangzhou 27000 m²  
6 Qiao f Garden Beijing 30000 m²  
7 BTV Beijing 22400 m²  
8 China Huadian Anfu Building Beijing 37000 m²  
9 East Pacific Center Shenzhen 69000 m²  
10 Dalian Futures Building Dalian 21500 m²  
11 TJTV Tianjin 20100 m²  
12 Bank of Communications Beijing Branch Beijing  21500 m²  
13 Bank of Inner Mongolia
 
Hohhot 40000 m²  
14 Dr. Peng wine bridge machine room
 
Chengdu 20000 m²  
15 BOE Eighth generation of liquid crystal displays Project
 
Beijing  10000 m²  
16 BOE Building No.2  Beijing  5000 m²  
17 National Super Computer Center
 
Shenzhen 8000 m²  
18 Leatop Plaza Guangzhou  37000 m²  
19 Bank of Nanjing Nanjing 17000 m²  
20 Suzhou Gold Mantis  Suzhou 8900 m²  
21 Grand International Mansion Guangzhou  40000 m²  
22 First East International Building
 
Beijing 20000 m²  
23 SZSE Shenzhen 40744 m²  
24 East Pacific Center Shenzhen 69000 m²  
25 Hangzhou Radio and Television Center Zhejiang 26000 m²  
26 CICC Data Center Beijing  10000 m²  
         
ⅱ. Detail of Some Typical Projects designed by foreign designer        
1 IFC       
  Architectural design  by Pelliclarke Pelli Architects     
  Interior design by Benoy architects     
         
2 Guangzhou Taikoo Hui Plaza      
  Architectural design  by ARQUITECTONICA    
  Structural design by Thornton - Tomasetti Engineers     
         
3 CCTV      
  Architectural design  by OMA and Rem Koolhaas    
         
ⅲ.JECC "MIRO" Calcium Sulphate Raised Access Floor System Projects in Overseas Market 
No. Project Name / Customer  Location Supply Area  
1 Sino 18 East Kowloon Hongkong 28000 m²  
2 133 Hoi Bun Road Hongkong 38800 m²  
3 No. 55 KING YIP STREET Hongkong 18200 m²  
4 Legislative Council Building of Hong Kong Hongkong 1200 m²  
5 Hongkong billion development Hongkong 89000 m²  
6 Tailand TOK Tailand  50000 m²  
7 Australian TASMAN  Australia 50000 m² per year  
8 Hitachi Japan 300000 m² per year  
9 Panasonic Japan 100000m² per year  
10 Spain POLYGROUP Spain 10000 m²  
11 NOOR AL KHALDIAH  Middle East 50000 m²  
JECC "MIRO" Calcium Sulphate Raised Access Floor System Project Achievements
         
ⅰ. Some Typital JECC "MIRO" Calcium Sulphate Raised Access Floor System Projects in China 
No. Project Name  Location Supply Area  
1 Shanghai IFC Shanghai  132000 m²  
2 Guangzhou Taikoo Hui Guangzhou  67154 m²  
3 Beijing JingAo center
 
Beijing 66000 m²  
4 CCTV  Beijing 61947 m²  
5 HZTV  Hangzhou 27000 m²  
6 Qiao f Garden Beijing 30000 m²  
7 BTV Beijing 22400 m²  
8 China Huadian Anfu Building Beijing 37000 m²  
9 East Pacific Center Shenzhen 69000 m²  
10 Dalian Futures Building Dalian 21500 m²  
11 TJTV Tianjin 20100 m²  
12 Bank of Communications Beijing Branch Beijing  21500 m²  
13 Bank of Inner Mongolia
 
Hohhot 40000 m²  
14 Dr. Peng wine bridge machine room
 
Chengdu 20000 m²  
15 BOE Eighth generation of liquid crystal displays Project
 
Beijing  10000 m²  
16 BOE Building No.2  Beijing  5000 m²  
17 National Super Computer Center
 
Shenzhen 8000 m²  
18 Leatop Plaza Guangzhou  37000 m²  
19 Bank of Nanjing Nanjing 17000 m²  
20 Suzhou Gold Mantis  Suzhou 8900 m²  
21 Grand International Mansion Guangzhou  40000 m²  
22 First East International Building
 
Beijing 20000 m²  
23 SZSE Shenzhen 40744 m²  
24 East Pacific Center Shenzhen 69000 m²  
25 Hangzhou Radio and Television Center Zhejiang 26000 m²  
26 CICC Data Center Beijing  10000 m²  
         
ⅱ. Detail of Some Typical Projects designed by foreign designer        
1 IFC       
  Architectural design  by Pelliclarke Pelli Architects     
  Interior design by Benoy architects     
         
2 Guangzhou Taikoo Hui Plaza      
  Architectural design  by ARQUITECTONICA    
  Structural design by Thornton - Tomasetti Engineers     
         
3 CCTV      
  Architectural design  by OMA and Rem Koolhaas    
         
ⅲ.JECC "MIRO" Calcium Sulphate Raised Access Floor System Projects in Overseas Market 
No. Project Name / Customer  Location Supply Area  
1 Sino 18 East Kowloon Hongkong 28000 m²  
2 133 Hoi Bun Road Hongkong 38800 m²  
3 No. 55 KING YIP STREET Hongkong 18200 m²  
4 Legislative Council Building of Hong Kong Hongkong 1200 m²  
5 Hongkong billion development Hongkong 89000 m²  
6 Tailand TOK Tailand  50000 m²  
7 Australian TASMAN  Australia 50000 m² per year  
8 Hitachi Japan 300000 m² per year  
9 Panasonic Japan 100000m² per year  
10 Spain POLYGROUP Spain 10000 m²  
11 NOOR AL KHALDIAH  Middle East 50000 m²  

 

CopyRight © 2019-2026   Jiangsu Eastchina Computer Room Group Co.,Ltd.  All rights reserved  Sitemap  All tags   Designed by Zhonghuan Internet